American Recovery & Reinvestment Act (ARRA) - Public Works

 PROJECTS

 DESCRIPTION

 AMOUNT ALLOCATED

 STATUS

Landscape Enhancement

Jeffrey/I-405 Bicycle Bridge Landscaping Enhancement Project

$354,000

Bid opening scheduled for 10/8/09

Rehabilitation

Red Hill Rehabilitation Project

$2,456,000

Notice to proceed with construction 1/4/10



Transportation

Jeffrey/I-405 Bicycle Bridge Landscaping Enhancement Project


  Location: Citywide
Allocation: $354,000
Funds Expended: $0
Status: Bid Date 10/8/09
Start Date: 11/9/2009
End Date: 3/26/10 (Construction) - 4/22/11 (Plant establishment)
Jobs Created: To be determined
Description: Plant new trees and shrubs, install mulch, install new reclaimed water meter and service lateral, flow sensor, master valve, mainline and lateral lines, spray heads, control wire, upgrade existing controller, install new controller and pedestal meter, and furnish and install interpretive signs as specified in the Special Provisions.   

 


Red Hill Rehabilitation Project

  Location: Citywide
Allocation: $2,456,000
Funds Expended: $0 (construction)
Status: Bids Received 8/23/09
Start Date: 1/4/10 (notice to proceed with construction)
End Date: 3/31/10
Jobs Created: To be determined
Description:

Pavement rehabilitation work to be performed on Red Hill Avenue between Reynolds and Deere shall include, but not be limited to: Cold milling; removal and replacement of AC pavement; AC and ARHM pavement surface course overlay; adjusting valve covers and manhole covers to grade; removal and replacement of damaged concrete curb, gutter and sidewalk; modifying curb ramps; and other items not mentioned here, but are required by the plans and the Special Provisions.