| Bulletin Number |
Bulletin Title |
| 303 |
ABS Piping Material |
| 290 |
Accessibility for Dining, Banquet, and Bar Facilities |
| 225 |
Additional Set of Modified Plans |
| 248 |
Allowable Use of Plastic Drainage Pipe Within Buildings |
| 193 |
Appointments Available with One-Stop Counter Staff |
| 301 |
Arc-Fault Circuit-Interrupter Protection |
| 151 |
Asphalt Concrete Inspection |
| 129 |
Awnings on Mobile Homes |
| 253 |
Building Construction Not Requiring A Permit |
| 229 |
Building Valuation Data |
| 147 |
Certification Requirements by Licensed Professionals |
| 246 |
Changes to Workers’ Compensation Regulations Effective January 1, 1995 |
| 240 |
Chimney Plan Submittal |
| 144 |
City Grading Ordinance |
| 313 |
Clearance Requirements for Commercial Appliances |
| 294 |
Clinics |
| 104 |
Commercial and Industrial Occupancies |
| 181 |
Concrete Placement in Foundations and Floor Slabs |
| 295 |
Concrete Slab Footing for Steel Storage Racks |
| 281 |
Concurrent Shell Building and Tenant Improvement Construction and Inspection |
| 106 |
Construction within Rights of Way by Utility Companies |
| 308 |
Corrosion Resistant Fasteners |
| 293 |
Corrugated Stainless Steel Tubing (CSST) |
| 202 |
Curb Address Painting |
| 145 |
Curb, Gutter and Sidewalk Repair |
| 107 |
Definition of “Family” |
| 207 |
Demolition Permits |
| 254 |
Disabled Access Plan Submittals |
| 296 |
Domestic Clothes Dryer Moisture Exhaust Duct Length Limitations |
| 316 |
Drafts Stop Requirements in Attics for Group R1 and R2 Occupancies |
| 128 |
Drains & P-Traps for Spas |
| 283 |
Drop Ceilings in R-3 Occupancies and Individual Units of R-1 Occupancies of Type V Fire-Resistive Construction |
| 272 |
Electric Meter Releases for Residential Dwellings |
| 195 |
Electrical Product Approval |
| 170 |
Electrical Requirements for Display Booths and Tents |
| 243 |
Elevator Lobby Special Egress-Control System Alternate Materials and Methods CA Building Code - Section 1004.5 |
| 315 |
Encroachment Permit Requirements for Barriers and Covered Walkways |
| 314 |
Encroachment Permit Requirements for Construction Cranes |
| 141 |
Encroachment Permit Standard Conditions |
| 244 |
Exit Requirements at Multi-theater Complex Common Lobby |
| 198 |
Expedited Review of Applications for Tenant Improvements in Buildings Approved Exclusively for Office Uses |
| 120 |
Fire Dampers in Shaft Enclosures |
| 200 |
Four Story Wood-Frame Construction Special Design and Detailing Requirements |
| 292 |
Fuel Modification Plan and Program Requirements |
| 275 |
Geotechnical Report Submittal Requirements (Seismic Analysis) |
| 262 |
Grading Bonds |
| 176 |
Grading Plan Processing |
| 206 |
Headroom Clearance of Parking Facilities for Postal Delivery Services |
| 112 |
Homeowner Permits and Inspection Services |
| 291 |
Illumination Requirements for Commercial Building Address Numerals |
| 203 |
Irvine Ranch Water District Approval on Water Distribution System |
| 111 |
Landscape Acceptance Procedures for Projects Subject to City Landscaping Inspections |
| 173 |
Leaf Blowers |
| 131 |
Lighting Permit Standards |
| 273 |
Lot Drainage Guidelines |
| 305 |
Mechanic Platforms on Equipment Access Ladders |
| 289 |
Medical Emergency Service Elevator |
| 288 |
Minimum Plumbing Facilities for Office Buildings (for employees) |
| 194 |
Multiple Application Submittals |
| 257 |
New Roof Covering Adjoining Existing Roofing |
| 317 |
Non-Structural Concrete Floor Slab Repair Requirements |
| 196 |
One-Stop Permit Processing Resubmittals |
| 233 |
Over Counter Same Day Permit Issuance |
| 126 |
Patio Cover Post to Footing Connection Requirements |
| 222 |
Permits for Condominiums, Townhouses and Attached Residential Units |
| 211 |
Piping Installation Plan Submittals |
| 132 |
Piping Requirements for Systems that Connect to Irvine Ranch Water District |
| 312 |
Plan Review and Inspection Requirements for Clearance to Combustibles for Solid Fuel Burning Equipment |
| 279 |
Plan Review Turnaround Times |
| 109 |
Plan Submittal, Installation and Inspection of Electric Signs and Outdoor Lighting |
| 172 |
Political Signs |
| 187 |
Pool Fences |
| 287 |
Protection of City Storm Drains and Catch Basins during Construction Activities |
| 306 |
Proto II Wall Approval Conditions |
| 180 |
Reclaimed Water |
| 285 |
Red Imported Fire Ant Quarantine |
| 142 |
Regulations Governing Permit Issued Subject to the Provisions of the Municipal Code of the City of Irvine |
| 230 |
Removal of Contaminated Soils/Groundwater |
| 183 |
Removal of Underground Fuel Storage Tanks |
| 156 |
Replacement of Doors and Windows |
| 114 |
Required Inspections |
| 241 |
Requirements for Building Permit for Underground Tank |
| 267 |
Requirements for Concrete Exposed to Sulfate-Containing Solutions or Soils |
| 311 |
Requirements for Fabrication Approval |
| 221 |
Requirements for Permit Issuance |
| 310 |
Requirements for Split System Air Conditioner Replacements |
| 208 |
Reroofing Permits and Inspection |
| 167 |
Residential Plan Check |
| 153 |
Residential Remodeling |
| 260 |
Restriction on Vehicular Traffic Associated With Home Occupation Businesses |
| 256 |
Retaining Walls Within the Turtle Rock Area (Planning Area 21) |
| 299 |
Roof Drainage System Sizing |
| 250 |
Roof Slope Requirements |
| 276 |
Rules for Revisions to Approved Building Plans |
| 163 |
School Facilities Fee Requirements |
| 204 |
Signage - Post Tension Slab in This Building |
| 228 |
Smoke Detector and Inspection Requirements for Reroofing Permit |
| 220 |
Soil Report Requirements for Additions |
| 284 |
Special Inspection Manual |
| 278 |
Special Inspection Program Requirements |
| 266 |
Special Inspections for Inspections Prior to Permit Issuance |
| 286 |
Stair Handrails |
| 270 |
Steel Frame Fire Block Requirements |
| 242 |
Steel Moment-Resisting Frame Construction Requirements |
| 251 |
Structural Observation Requirements |
| 302 |
Survey Requirements to Establish Required Property Line Setbacks |
| 182 |
Swimming Pool and Spa Plan Submittals |
| 217 |
Swimming Pool and Spa Removal / Demolition |
| 309 |
System 800 MHz Countywide Coordinated Communication |
| 235 |
Temporary Power Requirements for Residential Construction |
| 191 |
Tenant Improvement Plan Submittals |
| 136 |
Testing Laboratories (Gas Appliances) |
| 255 |
Tree Removal |
| 168 |
Truck Routes |
| 215 |
Utility Plan Requirements for Precise Grading Plan Submittals |
| 307 |
Valuation Threshold for Determining “Unreasonable Hardship” for Alterations, Structural Repairs, or Additions |
| 185 |
Wall and Fence Requirements |
| 209 |
Wet Signature Requirements on Plans |