COMMUNITY PARKS Last update: 2/25/10
|
|
Name
|
Description
|
Status
|
Closures
|
Est. Finish
|
|
Heritage
|
Playground: New picnic tables, trash receptacles, and benches; Install new playground equipment; New interactive water feature; New play surfacing (to include both resilient rubber and sand surfaces); ADA ramps (at parking lot and playground) and hand rail.
|
Construction is 80% complete. Playground equipment installation in progress.
|
Playground area
|
*Summer 2010
|
|
Northwood Community Center Modernization
|
Modernization and expansion of exiting community center to approximately 9,500 sq. ft. Goal: LEED certification.
|
Development of Design Options and Community Outreach Meetings.
|
Community Center and adjacent parking lot
|
2012
|
|
Northwood Monument Sign and Memorial
|
Design and construction of new monument sign with memorial plaque, lighted flagpole, seat walls and five pedestals inscribed with the names of fallen military personnel.
|
Plan check on going.
|
Turf area at corner of Yale and Bryan
|
Fall 2010
|
|
Oak Creek Turf Area
|
New turf area to provide overflow and warm-up space for players at adjacent athletic fields.
|
Construction grading permit and landscape permits were issued. Bid package complete.
|
N/A
|
TBD
|
|
Oak Creek Community Center
|
Design and construction of a new 6,000 sq. ft. community center.
Goal: LEED certification.
|
Development of Design Options and Community Outreach Meetings.
|
Turf area adjacent to baseball field
|
2013
|
|
Quail Hill Community Center
|
Design and construction of a new 12,500 sq. ft. community center.
Goal: LEED certification.
|
Development of Design Options and Community Outreach Meetings.
|
None
|
2013
|
|
University Community Center
|
Construction of a new 6,063 sq. ft. community center building with multi-purpose room, kitchen, exercise room, offices, storage and patio area. Rehabilitation of existing 3,823 sq. ft. community center building; site work, landscaping and irrigation. Goal: LEED certification.
|
Building construction in progress.
|
Community Center and Adventure Playground
|
*Spring 2010
|
|
University Community Park Playground
|
New playground area.
|
Plans and bid documents finalized.
|
Playground
|
*Summer 2010
|
|
NEIGHBORHOOD PARKS
|
|
Name
|
Description
|
Status
|
Closures
|
Est. Finish
|
|
Coralwood
|
Playground renovation.
|
Project complete.
|
|
Now open to the public
|
|
Meadowood
|
Playground renovation.
|
Project complete.
|
|
Now open to the public
|
|
Pepperwood
|
Playground renovation.
|
Project complete.
|
|
Now open to the public
|
|
Sweet Shade
|
New neighborhood park.
|
Project complete.
|
|
Now open to the public
|
|
SPECIAL FACILITIES
|
|
Name
|
Description
|
Status
|
Closures
|
Est. Finish
|
|
Adventure Playground
|
Inspect facility structures and play zones. Remove weeds and items in disrepair. Install clean fill in mud pit, rehabilitate water slide and drainage systems.
|
Work to be scheduled from fall 2010 to spring 2011.
|
Adventure Playground facility closed until Summer 2011.
|
June 2011
|
|
Animal Care Center
|
Remove existing concrete walkway and trellis, and construct new concrete walkway, new roof structure and covered walkway.
|
Construction substantially complete. Final inspections in progress.
|
Not at this time
|
March 2010
|
|
Bommer Canyon Trailhead
|
Provides public access to City’s open space area for hiking and biking purposes. Consists of 744 sq. ft. restroom building and 14 parking spaces.
|
Plan check and revisions in progress. SCE has completed its review.
|
N/A
|
TBD
|
|
Irvine Train Station
|
Renovate and repair the interior space and portions of the exterior for the Irvine Station’s Public Men’s and Women’s Restrooms; and renovate and repair the exterior plaza’s hardscape and landscape.
|
Construction in progress.
|
Existing men and women restrooms are closed, fenced off and under-construction. Temporary ADA-compliant restrooms installed and open for public use.
|
Spring 2010
|
|
Quail Hill Berm
|
Repair existing earth berm
|
Bids documents and plans and specs under review.
|
None
|
Summer 2010
|
|
William Woollett Jr Aquatics Center
|
Construction of a steel frame structure and metal panel roof system to be fabricated and installed.
|
Bids received and under review.
|
Not at this time
|
TBD
|
|
*Delayed due to rain
|